Engineering Standards, Specifications and Drawings
Water Standard Drawings
For Water System Construction
- Emergency Shower & Eyewash
- Installation of Vertical Gate Valves (Steel Pipe 14" & Larger; AC, PVC & DI Pipe 4" & Larger)
- Saddle Outlets - 3/4" to 36"
- Hop Tap Saddle Outlets 3/4" to 36" Diameters
- Trench Backfill
- Steel Flanges, 4" to 54"
- Butt Strap Details
- 1 1/2" Meter Installation
- 1 1/2" Copper Service Connection
- 2" Meter Installation
- 2" Copper Service Connection
- 6" x 1 - 2 1/2" Blow Off Installation (Steel Pipe)
- 6" x 1 - 2 1/2" & 1 - 4" Fire Hydrant Installation (Steel Pipe)
- 6" x 1 - 2 1/2" Blow-off Installation for AC, PVC & DI Pipe
- 6" x 1 - 2 1/2" & 1 - 4" Fire Hydrant Installation for AC, PVC & DI Pipe
- 2" Air Valve Installation
- Thrust Block Installation for Hub-End Pipe
- Water Pipe Installation and concrete Cap Detail for ACP, PVC & DI Pipe
- 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (Steel Pipe)
- 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation for AC, PVC & DI Pipe
- Telemetry Wire & Terminal
- 4" x 1 - 2 1/2" Blow-Off Temporary End Installation (Steel)
- Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings
- 6" x 1 - 2 1/2" Blow Off Temporary End Installation for AC, PVC & DI Pipe
- Steel Pipe Casing Water Pipeline
- Installation of Butterfly Valves
- 5/8" Meter Service Connection, 1" Copper Tubing
- 1" Copper Service Connection
- 1" Meter Service Connection, 1" Copper Tubing
- Reduced Pressure Backflow Preventer Assy for 3/4" - 2"
- Reduced Pressure Backflow Preventer Assy for 2 1/2" - 3"
- Reduced Pressure Backflow Preventer Assy for 4" - 10"
- 1" Air Valve Installation, 1" Copper Tubing
- 3" Meter Installation
- 4" Meter Installation
- 6" Meter Installation
- 8" Meter Installation
- Steel Cylinder Pipe- Field Joint Details Welded & Bonded Rubber Gasket
- 6" x 1 - 4" Blow-Off Installation - Saddle Tangent Outlet - Steel Pipe
- 10” x 12” Detector Meter with 6” Compound Bypass
- Locator Wire Installation
- 4", 6", 8" or 10" Double Check Detector Assembly & Reduced Pressure Detector Assembly
- Service Connections 1" through 4" on Water Appurtenance Lateral or Watermain 16" or Larger
- Air Test Details
- Test Stations: Insulated Joint and Insulated Joint at Valve
- Thermite Weld Details
- Test Stations: Line Current, Basic & Pipe with Casing
- Standard Restraint Tee, Dead End, Bend for PVC C-900 & C-905
- Guard and Marker Posts
- Formed Sealant Groove Detail and Typical Crack Repair
- Valve Cap & Riser Detail
- 4" & 6" Pressure Regulator above Ground Installation
- 8” Pressure Regulator above Ground Installation
- Recessed Trench Plate Detail
- Potable Water Sample Station
- 1" Residential Meter Service Connection 1" Copper Tubing
- Double Check Backflow Preventer Assy for sizes 3/4" - 2"
- Double Check Backflow Preventer Assy for sizes 2 1/2" - 3"
- Double Check Backflow Preventer Assy for sizes 4" - 10"
- Read Hole For Meter Vaults - Relacing A-496
- Typical Steel Tank Circumferential Stairway (sheet 1 of 2)
- Typical Steel Tank Circumferential Stairway (sheet 2 of 2)
- Steel Tank Roof Access Platform and Hatch
- Steel Tank Roof Hatch
- EMWD Facility Monument Sign
- 4" & Larger Service Connection
- Meter Cage - Flange Mount
- 3"-10" Air Vacuum & Air Release Valve Installation
- Wellhead Pump Foundation
- Chain Link Fence
- Read more
Sewer Standard Drawings
For Sewer System Construction
- Connecting Dissimilar Sewer Pipes
- Locking Type Manhole Cover & Frame
- Reinforced Precast Shallow Manhole
- Pipe Casing (Sewer Main)
- Sewer Cleanouts
- Sewer Tree Laterals & Cleanout
- Precast Reinforced Concrete, 48" & 60" ID Manhole
- Terminus Manhole
- Manhole Cover & Frame Standard & Watertight Manholes
- Sewer Connection at Concrete Encasement
- Grease Interceptor with 24" Sampling Box
- 36" ID Sampling Manhole Precast Reinforced Concrete
- Sand / Oil Interceptor with 24" Sampling Box
- Pipe Zone Bedding for Sewer Pipe
- Trench Backfill for Sewer Pipe
- Classification of Pipe Zone Bedding for Sewer Pipe
- Sewer Lateral Connections
- Sewer Lateral
- 48" and 60" Diameter Manhole Installation for HDPE Sewer Main
- Paving Around Manholes
- Connecting Dissimilar Sewer Pipes
- Existing Sewer Manhole Median Installation
- Precast Reinforced Concrete, 60" & 72" ID Flat top
- Sewer Concrete Anchor
- Read more
Recycled Water Standard Drawings
For Recycled Water System Construction
- Metered Service Line - Recycled Water
- Installation of Vertical Gate Valves, Steel Pipe 14" & Larger & PVC, DI 4 & AC Pipe 4" & Large - Recycled Water
- 2" Recycled Meter Installation
- 2" Recycled Service Connection
- 1-1/2" Recycled Meter Service Connection
- 1" Recycled Water Meter Installation
- 3" Recycled Meter Installation
- 4" Recycled Meter Installation
- 6" Recycled Meter Installation
- 8" Recycled Meter Installation
- Agricultural Above Ground Metered Service - Recycled Water
- 4"-8" Recycled Water Blow Off
- Read more