Drawing No. | Description | Revision No. | Revision Date |
---|---|---|---|
PB-1 | Metered Service Line - Recycled Water | 5 | 05/15/2015 |
PB-4 | Installation of Vertical Gate Valves, Steel Pipe 14" & Larger & PVC, DI 4 & AC Pipe 4" & Large - Recycled Water | 2 | 03/12/2001 |
PB-10 | 2" Recycled Meter Installation | 9 | 06/02/2022 |
PB-10A | 2" Recycled Service Connection | 6 | 06/02/2022 |
PB-11 | 1-1/2" Recycled Meter Service Connection | 1 | 06/02/2022 |
PB-12 | 1" Recycled Water Meter Installation | 5 | 06/03/2022 |
PB-13 | 3" Recycled Meter Installation | 3 | 09/29/2023 |
PB-14 | 4" Recycled Meter Installation | 2 | 06/03/2022 |
PB-15 | 6" Recycled Meter Installation | 2 | 06/03/2022 |
PB-16 | 8" Recycled Meter Installation | 2 | 06/02/2022 |
PB-17 | Agricultural Above Ground Metered Service - Recycled Water | 6 | 06/03/2022 |
PB-18 | 4"-8" Recycled Water Blow Off | 7 | 09/25/2020 |