All Engineering Provisions are provided in PDF format with the exception of Sections 01026, 01430, 09875.1, and 09878.1 which are project specific. Modifications to these standard provisions are prohibited. Revisions to EMWD’s Standard Detailed Provisions should be called out in a separate section as “SC2 – Supplemental Special Conditions” or submit a supplemental detail provision (for example: 15061.1).

Helpful Tip: Save a copy of the PDF file to your computer by right-clicking on the link and selecting the “Save Target As…” option.


Also of interest may be EMWD’s Boilerplate Documents for Engineering Provisions.

Maintenance Manual Requirements

Division 0: Contracting Requirements

Section Provision Revision Date Update Log
(Details)
00220 Soils Investigation 06/2006  
00230 Construction Surveying 10/2001  

Division 1: General Project Provisions

Section Provision Revision Date Update Log
(Details)
01000 General Safety Requirements 02/2024 Update Log
01026 Schedule of Values 10/2020  
01310 Project Control Schedule - Large Job 02/2024  
01310.1 Project Control Schedule - Small Job 02/2024  
01380 Pre-construction Audio/Video Taping: Pipelines & Roadways 11/2021  
01381 Pre-construction Audio/Video Taping: Above Ground Facilities 11/2021  
01430 Maintenance Manual Requirements 10/2020 Update Log

Division 2: Construction/Installation Provisions

Section Provision Revision Date Update Log
(Details)
02050 Demolition and Salvage 07/1994  
02051 Temporary Sewage Lift Station Demolition 06/2021  
02201 Construction Methods & Earthwork 04/2015  
02205 Tank Site Preparation and Base Ring Construction 07/2005  
02210 Site Grading 05/2010 Update Log
02221 Trenching, Backfilling, and Compacting 04/2015 Update Log
02242 Cement Stabilized Sand Bedding/Backfill 02/1995  
02252 Control Density Fill 05/2016 Update Log
02253 Controlled Low Strength Material 04/2003 New
02271 Grouted Rip-Rap 10/2020  
02433 Drainage Pipe: Reinforced Concrete Pipe - Storm Drain 10/2020  
02444 Chain Link Fencing 07/2005  
02505 Roadway Base Course 08/1992  
02513 Asphalt Concrete Paving 08/2008 Update Log
02597 Pond Lining - Treated Soil 02/1995  
02598 Pond Lining - Clay and Flexible Membrane 10/2020  
02718 Installation of Water Pipeline 05/2022 Update Log
02725 Installation of Copper Pipe and Tubing 05/1992  
02733 Water Well Drilling, Casting and Gravel Installation, Development, and Testing 10/2020  
02734 Water Well Drilling, Casing & Testing 01/2010 Update Log
02740 Water Pump Foundation 06/2014  
02761 Furnish & Install Vitrified Clay Sewer Pipe System 12/2021 Update Log
02762 Furnish & Install Plastic Sewer System 12/2021 Update Log
02768 Furnish & Install PVC Force Main 05/2010 Update Log
02769 Furnish & Install High Density Polyethylene (HDPE) Sewer Pipe System 10/2002  
02810 Irrigation System 10/2020  
02950 Trees, Plants, and Ground Covers 10/2020  

Division 3: Concrete Provisions

Section Provision Revision Date Update Log
(Details)
03150 Formwork for Cast-in-place Concrete 10/2020  
03200 Reinforcing 09/2020  
03300 Cast-in-Place Concrete 10/2020 Update Log
03604 Casing Grouting-Annular Space 03/1995  

Division 4: Masonry Provisions

Section Provision Revision Date Update Log
(Details)
04220 Concrete Masonry Units 10/2020 Update Log

Division 5: Metals

Section Provision Revision Date Update Log
(Details)
05100 Structural Metals    
05600 Standards for Aluminum Work 02/1998  

Division 6: Wood, Plastics and Composites

Section Provision Revision Date Update Log
(Details)
06100 Carpentry Work 10/2020 Update Log
06640 Plastic Lining for Concrete Structure 04/2000  

Division 7: Thermal and Moisture Protection

Section Provision Revision Date Update Log
(Details)
07920 Sealants and Caulking 08/1992  

Division 8: Openings

Section Provision Revision Date Update Log
(Details)
08365 Rolling Service Doors - Chain Operated    
08711 Locksets and Hardware 05/2015 Update Log

Division 9: Finishes (Coatings)

Section Provision Revision Date Update Log
(Details)
09810 Tape Wrap for Insulated Joints 10/1999  
09811 Chemical Resistant Coatings 08/1992  
09871 Coating System for Water Pumping Plants 08/2000  
09873 Interior Coating, Disinfection and Exterior Painting of a New Welded Steel Water Tank Using Both Shop & Field Coating Operations 10/2019 Update Log
09873.1 Interior Coating, Disinfection and Exterior Painting of a New Welded Steel Water Tank Custom Section 3.06 and 3.07    
09875  Repainting of Ext Surf of an Existing Welded Steel Tank Based on 100% or Spot Removal of Exist Paint Replace w/ a New Paint Sys 10/2019 Update Log
09875.1 Repainting of Exterior Surfaces of an Existing Welded Steel Tank Custom Section 3.06_Requires Update    
09876 Repainting of Exterior Surfaces Based on 100% or Spot Removal of Lead Based Paint & Replacement    
09878 Recoating & Disinfect of Int Surf of an Exist Welded Steel Tank Based on 100% Removal of Exist Coat & Replace w/ Epoxy Coat Sys 10/2019 Update Log
09878.1 Recoating and Disinfection of Interior Surfaces of an Existing Welded Steel Tank Custom Section 3.07_Requires Update    
09900 Painting and Protective Coatings 10/2020 Update Log
09940 Epoxy Coating 09/1985  

Division 10: Specialties

Section Provision Revision Date Update Log
(Details)
  There are no specialties provisions at this time.    

Division 11: Equipment Provisions

Section Provision Revision Date Update Log
(Details)
11005 General Mechanical and Equipment Provisions 05/2021 Update Log
11021 Natural Gas Engine 10/2001  
11200 Small Submersible Sewage Lift Station with Emergency Stand by Power 06/2021  
11211 Centrifugal Pumps 10/2007 Update Log
11240.1 DPS - Chemical Metering Pumps 01/1995  
11240 Chemical Meter Pumps - General 01/1995  
11241 Chlorination System 10/2002  
11250 Diesel Generator 06/2021 New
11293 Slide Gates    
11294 Stainless Steel Sluice Gates 08/1999  
11343 Screenings Compactor    
11352 Scum Collection Equipment 08/1999  
11931 Horizontal Centrifugal Water Pumps 10/2007 Update Log
11936 Vertical Turbine Pumps 10/2007 Update Log
11937 Deep Well Vertical Pumps 10/2007 Update Log
11938 Progressing Cavity Pump 10/2007 Update Log

Division 13: Steel Building/Storage Tanks

Section Provision Revision Date Update Log
(Details)
13122 Prefabricated Steel Building 02/1995  
13123 Electrical Panel Sunshade Structure 06/2021  
13311 Welded Steel Tanks for Water Storage 04/2020 Update Log
13312 Bolted Steel Tanks for Water Storage 11/2013 Update Log
13446 Valve and Gate Operations    

Division 15: Pipe/Fittings/Valves/Manholes

Section Provision Revision Date Update Log
(Details)
15054 Reinforced Concrete Pipe with PVC Lining 12/1991  
15057 Ductile Iron Water Pipe and Fittings 05/2001  
15058 Cast Iron Fittings 05/1990  
15059 Welded Steel Fittings 08/1985  
15061 Steel Cylinder Water Pipe 10/2023  
15064 Plastic (PVC) Pressure Water Pipe & Fittings 09/2016 Update Log
15072 Asbestos-Cement Water Pipe 11/1987  
15077 Grooved Couplings 01/2000  
15081 Gaskets 12/2009 Update Log
15089 Nuts & Bolts 10/2007 Update Log
15102 Resilient-Seated Gate Valves 12/2020  
15103 Butterfly Valves 01/2006

 

15103.1 Butterfly Valves, Earthquake Sensing Pneumatic-Operated 01/1991  
15104 Ball Valves 08/1994  
15105 Plug Valves 06/2007 Update Log
15108 Air Release Valves for Sewage Service 12/1997  
15111 Check Valves 02/1997  
15120 Control Valves 03/1987  
15136 Air Valves 03/1995   
15173.1 Propeller-Type Water Flowmeters 05/1993  
15330 Vitrified Clay Sewer Pipe (Plain End)(Limited to Maximum Pipe Diameter of 12”) 05/1993  
15331 Vitrified Clay Sewer Pipe (Bell & Spigot) 01/2006  
15333 Cast Iron & Ductile Iron Sewer Pipe 08/1985  
15340 Manholes & Fittings 09/1999  
15350 Sewer Pump Station, Manhole Type 10/2007 Update Log
15351 Sewage Pump Station, Vault Type 10/2007 Update Log
15385 Pipe Bursting 08/1999  
15430 Emergency Eyewash/Shower Units 09/2007 Update Log

Division 16: Electrical Provisions

Section Provision Revision Date Update Log
(Details)
15700 Heating, Ventilation, and Air Conditioning Equipment 04/2016 New
16010 General Electrical Requirements 10/2020  
16040 Short-Circuit/Coordination Study and Arc-Flash Hazard Study 10/2020  
16050 Basic Electrical Materials and Methods 10/2019 Update Log
16150 Induction Motors 04/2016  
16151 Vertical Hollowshaft Electric Motors 04/2016  
16160 A.C. Variable Frequency Drives 09/2022 Update Log
16250 Automatic Transfer Switch 10/2020 New
16251 Manual Transfer Switch 10/2020 New
16480 Motor Control Centers, Switchboards, and Panelboards 10/2020 Update Log
16640 Corrosion Monitoring System for Underground Piping 07/2017 Update Log
16890 Fiber Optic Cabling and Components 04/2016  
16950 Custom Control Panels 04/2016  

Division 17: Programmable Systems Provisions

Section Provision Revision Date Update Log
(Details)
17005 General Instrumentation and Control Components 04/2016 New
17010 Programmable Logic Controller 10/2019 Update Log
17210 Magnetic Flowmeters 04/2016 New
17310 Site Access System 04/2016 New