Capital Improvement Project Standards
Overview
Capital Improvement Project Standards
EMWD’s Engineering Department has developed the following documents in an effort to provide for the efficient design, construction and operation of EMWD facilities.
RFP Post
EMWD Boilerplate Documents for Engineering Provisions
Select the general type of boiler plate document you need from the list. To see what documents you need, refer to the Checklist for Specifications .
- Proposal Package Cover Sheet
- Specification Template for PUBLIC WORKS Works Projects
- Specification Template for MAINTENANCE PROJECTS
- Specification Template for DEVELOPER-BID Projects
- Instructions to Bidders
- Instructions to Bidders - Federal
- Bid Bond
- Bidder's Detailed Experience Record & Resumes
- Proposal Sheet - 7-day
- Proposal Sheet - 15-day
- Bidders References
- Designation of Subcontractors
- Contractors Licensing Statement
- Non Collusion Declaration - No Notary
- Agreement
- Performance Bond
- Subcontractor Performance Bond
- Payment Bond
- Subcontractor Payment Bond
- Worker's Compensation Certificate
- Certificate of Liability Insurance-Standard Sample per Section F
- Iran Contracting Act Certification
- Economic Sanctions in Response to Russia Form
- Maintenance Bond by Contractor
- Maintenance Bond by Developer
- Maintenance Bond by Supplier
- Cal-OSHA Form 300A
- C-17 Contractor’s Cal/OSHA Compliance History and SIC Code
- 00054 Pipe Zone Density DIP
- 00054 Pipe Zone Denisty HDPE
- 00054 Pipe Zone Density CCP
- 00054 Pipe Zone Density CML&C
- 0054 Pipe Zone Density PVC
- Employee Safety & Health Training Records
- Public Works Contractor Registration
- Contractor's Proof of Insurance Certificate
- Materials
- General Conditions: Inspection and Testing
- Labor and Construction & Exhibit A
- 00064_F_Exhibit A_only_Escrow_Agreement
- Non-discrimination in Employment
- Maintenance Warranty of Water Pipeline 4" in Diameter & Larger
- Appendix A: Approved Materials List
- Update Log
- Update Log
- Read more
RFP Post
EMWD Standard Detailed Provisions
Select the general type of provision you need from the list.
- Soils Investigation
- Construction Surveying
- General Safety Requirements
- Schedule of Values
- Project Control Schedule - Large Job
- Project Control Schedule - Small Job
- Pre-construction Audio/Video Taping: Pipelines & Roadways
- Pre-construction Audio/Video Taping: Above Ground Facilities
- Maintenance Manual Requirements
- Demolition and Salvage
- Temporary Sewage Lift Station Demolition
- Construction Methods & Earthwork
- Tank Site Preparation and Base Ring Construction
- Site Grading
- Trenching, Backfilling, and Compacting
- Cement Stabilized Sand Bedding/Backfill
- Control Density Fill
- Controlled Low Strength Material
- Grouted Rip-Rap
- Drainage Pipe: Reinforced Concrete Pipe - Storm Drain
- Chain Link Fencing
- Roadway Base Course
- Asphalt Concrete Paving
- Pond Lining - Treated Soil
- Pond Lining - Clay and Flexible Membrane
- Installation of Water Pipeline
- Installation of Copper Pipe and Tubing
- Water Well Drilling, Casting and Gravel Installation, Development, and Testing
- Water Well Drilling, Casing & Testing
- Water Pump Foundation
- Furnish & Install Vitrified Clay Sewer Pipe System
- Furnish & Install Plastic Sewer System
- Furnish & Install PVC Force Main
- Furnish & Install High Density Polyethylene (HDPE) Sewer Pipe System
- Irrigation System
- Trees, Plants, and Ground Covers
- Formwork for Cast-in-place Concrete
- Reinforcing
- Cast-in-Place Concrete
- Casing Grouting-Annular Space
- Concrete Masonry Units
- Structural Metals
- Standards for Aluminum Work
- Carpentry Work
- Plastic Lining for Concrete Structure
- Sealants and Caulking
- Rolling Service Doors - Chain Operated
- Locksets and Hardware
- Tape Wrap for Insulated Joints
- Chemical Resistant Coatings
- Coating System for Water Pumping Plants
- Interior Coating, Disinfection and Exterior Painting of a New Welded Steel Water Tank Using Both Shop & Field Coating Operations
- Interior Coating, Disinfection and Exterior Painting of a New Welded Steel Water Tank Custom Section 3.06 and 3.07
- Repainting of Ext Surf of an Existing Welded Steel Tank Based on 100% or Spot Removal of Exist Paint Replace w/ a New Paint Sys
- Repainting of Exterior Surfaces of an Existing Welded Steel Tank Custom Section 3.06_Requires Update
- Repainting of Exterior Surfaces Based on 100% or Spot Removal of Lead Based Paint & Replacement
- Recoating & Disinfect of Int Surf of an Exist Welded Steel Tank Based on 100% Removal of Exist Coat & Replace w/ Epoxy Coat Sys
- Recoating and Disinfection of Interior Surfaces of an Existing Welded Steel Tank Custom Section 3.07_Requires Update
- Painting and Protective Coatings
- Epoxy Coating
- General Mechanical and Equipment Provisions
- Natural Gas Engine
- Small Submersible Sewage Lift Station with Emergency Stand by Power
- Centrifugal Pumps
- DPS - Chemical Metering Pumps
- Chemical Meter Pumps - General
- Chlorination System
- Slide Gates
- Stainless Steel Sluice Gates
- Screenings Compactor
- Scum Collection Equipment
- Horizontal Centrifugal Water Pumps
- Vertical Turbine Pumps
- Deep Well Vertical Pumps
- Progressing Cavity Pump
- Prefabricated Steel Building
- Electrical Panel Sunshade Structure
- Welded Steel Tanks for Water Storage
- Bolted Steel Tanks for Water Storage
- Valve and Gate Operations
- Reinforced Concrete Pipe with PVC Lining
- Ductile Iron Water Pipe and Fittings
- Cast Iron Fittings
- Welded Steel Fittings
- Steel Cylinder Water Pipe
- Plastic (PVC) Pressure Water Pipe & Fittings
- Asbestos-Cement Water Pipe
- Grooved Couplings
- Gaskets
- Nuts & Bolts
- Resilient-Seated Gate Valves
- Butterfly Valves
- Ball Valves
- Plug Valves
- Air Release Valves for Sewage Service
- Check Valves
- Control Valves
- Air Valves
- Propeller-Type Water Flowmeters
- Vitrified Clay Sewer Pipe (Plain End)
- Vitrified Clay Sewer Pipe (Bell & Spigot)
- Cast Iron & Ductile Iron Sewer Pipe
- Manholes & Fittings
- Sewer Pump Station, Manhole Type
- Sewage Pump Station, Vault Type
- Pipe Bursting
- Emergency Eyewash/Shower Units
- Heating, Ventilation, and Air Conditioning Equipment
- General Electrical Requirements
- Short-Circuit/Coordination Study and Arc-Flash Hazard Study
- Basic Electrical Materials and Methods
- Induction Motors
- Vertical Hollowshaft Electric Motors
- A.C. Variable Frequency Drives
- Automatic Transfer Switch
- Manual Transfer Switch
- Motor Control Centers, Switchboards, and Panelboards
- Corrosion Monitoring System for Underground Piping
- Fiber Optic Cabling and Components
- Custom Control Panels
- General Instrumentation and Control Components
- Programmable Logic Controller
- Magnetic Flowmeters
- Site Access System
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Appendix A: Approved Materials List
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Update Log
- Diesel Generator
- Butterfly Valves, Earthquake Sensing Pneumatic-Operated
- Butterfly Valves, Altitude Valve and Seismic Sensing Closing System
- Read more