Construction Bid Results
Spec. 1383W, SJValley Raw Water Conveyance Fac EM-25 Service Connection_EM-25 Flow Control and Chlorination Fac
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 09/27/2021 6:00 AM |
Close Date | 12/01/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
- NIB/Pre-Bid WalThru Directions
- Proposal Package
- Specification - Volume 1
- Specification - Volume 2
- Specification - Volume 3
- Appendix A - Approved Materials List
- Appendix B - Hot Tap Contractors
- Appendix C - Mitigation Monitoring and Reporting Program
- Appendix D1 - Geotechnical Baseline Report
- Appendix D2 - Geotechnical Investigation
- Appendix D3 - Geotechnical Plan Review
- Appendix E - SCE Service Plan
- Appendix F - San Jacinto Feeder Pipeline Record Drawings
- Appendix G - MWD Eastside Pipeline Record Drawings
- Appendix H - Monument Sign Sample
- Appendix I - MBE-WBE General Contractor's Requirements
- Appendix J - Dewatering Exhibits
- Appendix K - PreProcurement Exhibit
- Appendix L - MWD Eastside Pipeline Shop Drawing
- Appendix M - 1382W Baseline Construction Schedule
- Construction Drawings - Schedule A EMWD
- Construction Drawings - Schedule B MWD
- Mandatory Pre-Bid Walk Through Sign-in Sheet
- Addendum No. 1
- Revised Proposal Package_Addendum No. 1
- Revised Scheduled of Values_Addedum No. 1
- Revised Appendix I_Addendum No. 1
- Addendum No. 2
- Addendum No. 2 Proposal Package
- Addendum No. 2 Revised Sch A Drawings
- Addendum No. 2 Revised Sch B Drawings
- Preliminary Bid Summary
- J.F. Shea Construction, Inc.
- Kiewit Infrastructure West Co.
- Steve P. Rados, Inc.
- W.A. Rasic Construction Co., Inc.
- Final Bid Summary
- Read more
Spec 1368W – Redlands and Cottonwood Booster Electrical Replacement
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 09/20/2021 6:00 AM |
Close Date | 10/19/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
PREQUALIFIED CONTRACTORS ELIGIBLE TO BID
- Specification
- Construction Drawings
- NIB/Pre-Bid Walk Thru Directions
- Proposal Package
- Appendix A - Approved Materials List
- Appendix B - SCE Service Plans
- Appendix C - CAM 17 Coating Analysis
- Appendix D - Shutdown Coordination Table
- Appendix E - Redlands & Cottonwood Booster Record Drawings
- Appendix F - Asbestos Test Results
- Appendix G - Emergency Standby Generator Sizing Report
- Appendix H - Cable Tray Weight/Fill Calculations & Structural Load Assessment
- Appendix I - Pump Curve For Pump No. 4
- Appendix J - Subsurface Utility Report
- Pre-Bid Walk-Through Sign-In Sheet
- Addendum No. 1
- Preliminary Bid Summary
- Leed Electric, Inc.
- Baker Electric, Inc.
- CDM Constructors, Inc.
- Southern Contracting Company
- CSI Electrical Contractors, Inc.
- Final Bid Summary
- Read more
Spec 1381W – Hewitt & Evans Groundwater Treatment Facility Phase 1
PREQUALIFICATION ONLY
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 08/24/2021 6:00 AM |
Close Date | 09/23/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
Spec. 1412S – MVRWRF Plant 2B Equipping, Centrate, and Flow Diversion Project – PREQUALIFICATION ONLY
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 08/20/2021 8:00 AM |
Close Date | 09/21/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
Spec. 1342W Pettit Regulated Pressure Zone
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 08/23/2021 6:00 AM |
Close Date | 09/27/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
- Notice Inviting Bid
- Specification
- Construction Drawings
- Proposal Package
- Appendix A
- Appendix B
- Appendix C
- Appendix D
- Appendix E
- Appendix F
- Appendix G
- Pre-Bid Walk Through Sign-In Sheet
- Virtual Pre-Bid Walk Through Power Point Presentation
- Addendum No. 1
- Drawings (D-55159, D-55160, D-55163 & D-55715C)
- Appendix H - PRS 2 Relocation Exhibit
- Appendix I - Food 4 Less Fuel Station - Water and Sewer Map
- RCFCWCD Encroachment Permit
- Preliminary Bid Summary
- Weka, Inc.
- Hemet Manufacturing Co., Inc. dba Genesis Construction
- Final Bid Summary
- Read more
Spec. 1326S, Day Street Lift Station Wetwell Piping Replacement
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 07/22/2021 11:00 AM |
Close Date | 08/19/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
- Specification
- Construction Drawings
- Pre-Bid Walk Through Directions
- Proposal Package
- Mandatory Pre-Bid Walk Through Sign-in Sheet
- Addendum No. 1
- Preliminary Bid Summary
- Canyon Springs Enterprises dba RSH Construction Company
- GSE Construction Company, Inc.
- Hemet Manufacturing Company, Inc. dba Genesis Construction
- Metro Builders & Engineers Group, Ltd.
- Pacific Hydrotech Corporation
- Schuler Constructors, Inc.
- SCW Contracting Corp.
- Final Bid Summary
- Read more
Spec. 1435W Mountain Avenue Gap Pipeline
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 07/19/2021 6:00 AM |
Close Date | 08/17/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
- Notice Inviting Bid
- Proposal Package
- Specification
- Construction Drawings
- Pre-Bid Walk Thru Sign In Sheet
- Questions & Answers
- Preliminary Bid Summary
- C.P. Construction Co., Inc.
- Christensen Brothers General Engineering, Inc.
- Dominguez General Engineering, Inc.
- Downing Construction, Inc.
- E.J. Meyer Company
- El-Co Contractors, Inc.
- Ferreira Construction Company, Inc. dba Ferreira Coastal Construction Co.
- Hemet Manufacturing Company, Inc. dba Genesis Construction
- T.E. Roberts, Inc.
- Weka, Inc.
- Final Bid Summary
- Read more
Spec. 1447P, Myers St Recycled Water Pipeline Crossing at Florida Ave
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 07/19/2021 6:00 AM |
Close Date | 08/23/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
- Specification
- Pre-Bid Walk Through Directions
- Proposal Package
- Construction Drawings
- Pre-Bid Walk Through Sign- In Sheet
- Addendum No. 1
- Preliminary Bid Summary
- C.P. Construction Co., Inc.
- Christensen Brothers General Engineering, Inc.
- Downing Construction, Inc.
- Hemet Manufacturing Company, Inc. dba Genesis Construction
- Final Bid Summary
- Read more
Request for Bid
Long Lead Treatment Equipment For Perris North Basin Groundwater Contamination Prevention and Remediation Program
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 06/17/2021 1:30 PM |
Close Date | 08/13/2021 10:00 AM |
THE DISTRICT HAS ELECTED TO REJECT ALL BIDS FOR THIS PROJECT. THE PROJECT WILL REBID IN THE FUTURE.
Refer to the Bidding Information or Addenda for Important Dates
Prequalification for Perris North Basin Groundwater Contamination Prevention and Remediation Program
- Groundwater Treatment Facilities
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 06/08/2021 11:30 AM |
Close Date | 07/08/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
PREQUALIFIED CONTRACTORS
GSE Construction Company, Inc.
J.F. Shea Construction, Inc.
Pacific Hydrotech Corporation
Shimmick Construction Company, Inc.
W. M. Lyles Co.
Walsh Construction Company II, LLC
- Public Invitation for Prequalification
- Prequalification Form
- Attachments M and N
- Addendum No. 1
- Attachment - Wells 65-66 90% Specification
- Attachment P - Wells 65-66 90% Construction Drawings
- Attachment Q - Wells 206-209 90% Specification
- Attachment Q - Wells 206-209 90% Construction Drawings Part 1
- Attachment Q - Wells 206-209 90% Construction Drawings Part 2
- Read more