Skip to main content
Eastern Municipal Water District Home
Home
Who We Are
Public Affairs
Plans, Reports and Studies

Who We Are

Plans, Reports and Studies

Plans

Climate Action Plan

EMWD’s 2022 Climate Action Plan provides detailed information on EMWD’s efforts to reduce Greenhouse Gas Emissions in support of statewide targets.

Climate Action Plan (2022)

 

Sewer System Management Plan (SSMP)

The State Water Resources Control Board (SWRCB)adopted the Statewide General Waste Discharge Requirement for Sanitary Sewer Systems (WDR SSS) on May 2, 2006 that required the development and implementation of a Sewer System Management Plan (SSMP). The purpose of the SSMP is to document EMWD’s program to properly operate and maintain its sanitary sewer system. The SSMP also identifies the chain of communication for reporting overflows, from receipt of a complaint or other information, including the person responsible for reporting sanitary sewer overflows to the SWRCB, Riverside County Health Departments and the California Emergency Management Agency (CalEMA).

For further information or questions about EMWD SSMP, please contact Anthony Budicin at 951.928.3777, ext. 6252.

Sewer System Management Plan (SSMP) 2019

 

Urban Water Management Plan (UWMP)

EMWD’s 2020 Urban Water Management Plan (UWMP) is an update to the 2015 UWMP and was prepared in response to Water Code Sections 10610 through 10656 of the Urban Water Management Planning Act. Included in the plan is detailed information about EMWD’s water demand, supply and reliability for the next 25 years.

Urban Water Management Plan (UWMP)

Reports

Hemet/San Jacinto Groundwater Management Area Annual Report

The Annual Report is prepared by EMWD for the Hemet-San Jacinto Watermaster. The Hemet-San Jacinto Watermaster has provided EMWD permission to publish the Annual Report on our website. This report documents the activities undertaken in support of the Hemet/San Jacinto Water Management Plan.

Hemet/San Jacinto Groundwater Management Area Annual Report

 

West San Jacinto Groundwater Management Area Annual Report

As a part of the West San Jacinto Groundwater Basin Management Plan, EMWD produces an Annual Report on the status of the groundwater sub-basins within the district.

West San Jacinto Groundwater Management Area Annual Report

 

State of the San Jacinto Basins

White paper that helped to form the West San Jacinto Groundwater Basin Management Plan.

State of the San Jacinto Basins

Studies

Quail Valley Sewer Subarea 4 Sewerage Feasibility Study

In 2022, EMWD hired Engineering Resources of Southern California, Inc. (ERSC) to prepare a feasibility study to present preliminary design options for a formal sewer collection and conveyance system for Subarea 4, and the preliminary design of the sewer backbone extension in Goetz Road. This study is a continuation of a series of preceding reports and projects. The original report, “Quail Valley Sewer Improvements Alternatives Study”, October 2005, divided Quail Valley into nine (9) subareas for ease of analysis. Due to cost and other constraint factors, it was determined that any 2005 Study recommendations required phased implementation.

Quail Valley Sewer Subarea 4 Sewerage Feasibility Study (2022)

 

Draft Quail Valley Sewer Improvement Alternatives Study

In 2005, EMWD hired PBS&J to prepare a study to identify and evaluate the collection system within Quail Valley. The objective of the study is to find a feasible solution to the problem of septic system pollution in that area.

Draft Quail Valley Sewer Improvement Alternatives Study (2005)