Spec. 1393P, Temecula Valley Recycled Water Pipeline Phase 2
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 04/05/2021 6:00 AM |
Close Date | 05/04/2021 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
ORIGINAL BID DOCUMENTS
NIB/Pre-Bid Walk Thru Directions
Appendix A - Approved Materials List
Appendix B - TV Recycled Water Pipeline MMRP
Appendix C - Geotechnical Investigations
Appendix D - Operational Control Strategy Sequence of Work
Appendix E - Subsurface Utility Report
Appendix F - Reference Drawings
Appendix G - MBE-WBE General Contractor's Requirements
SITE VISIT WALK THROUGH SIGN-IN SHEET
Mandatory Pre-Bid Walk Through Sign-in Sheet
ADDENDA/LETTER OF CLARIFICATION
PROPOSAL RESULTS
PROPOSAL PACKAGES
Christensen Brothers General Engineering, Inc.
Ferreira Construction Co., Inc. dba Ferreira Coastal Co.
Hemet Manufacturing Company, Inc. dba Genesis Construction
PROJECT INFO
Official Bid Publication Date posted on EMWD website: April 5, 2021
Bonding Estimate: $2.0M – $2.5M
Project Location: Intersection of Elm Street and Washington Avenue in Riverside County to inside the Santa Rosa Regional Resources Authority’s existing Santa Rosa Water Reclamation Facility.
PLANHOLDER REGISTRATION: If obtaining these documents online, please complete the Planholder Registration form to be placed on the official planholders list and receive notifications of addenda and/or letters of clarification issued (for this project). Bidders are responsible for ensuring that they have received any and all addenda. If you have any questions, please email zamoras@emwd.org.
PUBLIC WORKS CONTRACTOR REGISTRATION: Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration. To obtain an extract go to: https://efiling.dir.ca.gov/PWCR/