Skip to main content Skip to site navigation

Spec 1382W and 1383W: San Jacinto Valley Raw Water Conveyance Facilities Phase 1 Program – PREQUAL ONLY

RFP Post
Department Construction
Category Closed
Publication/Issue Date 05/11/2020 2:30 PM
Close Date 06/18/2020 5:00 PM

Refer to the Prequalification Invitation or Addenda for Important Dates

PREQUALIFIED CONTRACTORS LIST

Prequalified Contractor List

PREQUALIFICATION DOCUMENTS

Prequalification Package
Attachment M - San Jacinto Valley Raw Water Conveyance Facility Pipeline
Attachment N - EM-25 Service Connection
Attachment O - Flow Control Facilities and Chlorination Facility
Prequalification Invitation

ADDENDA/LETTER OF CLARIFICATION

Addendum No. 1
Letter of Clarification No. 1

PROJECT INFO

Official Prequalification Publication Date posted on EMWD website: May 11, 2020

Submission of Completed Prequalification Package: 5:00 PM Thursday, June 18, 2020

NOTE: Failure to submit five (5) Flash Drives (electronic copy in searchable PDF) and/or incomplete packages are ground for immediate disqualification.

Notification of Prequalification Status: July 6, 2020

Questions Due: 5:00 PM Thursday, May 21, 2020

Preliminary Bonding Estimate: $11 – $19 Million

Project Location: Cities of San Jacinto and Hemet.  Pipeline located along Esplanade Avenue, Sanderson Avenue, and Commonwealth Avenue between Warren Road and Kirby Street.  The flow control and chlorination facility is located near the intersection of Esplanade Avenue and Warren Road.

MINIMUM QUALIFICATION REQUIREMENTS:

Specification No. 1382W

  • Schedule A/B: Transmission Pipeline Phase 1 and San Jacinto Valley Feeder Cathodic Protection Improvements

General Contractors must demonstrate the satisfactory completion, as a prime general engineering contractor of at least three (3) similar projects within the last ten (10) years, of projects meeting the following requirements:

A. Contract Type: Public Works

B. Construction Type: 48-inch diameter or larger pressurized water transmission pipelines including valves, fittings, and related appurtenances; and Cathodic Protection equipment. At least one project shall be cement mortar lined and coated welded steel pipe.

C. Valve: $8 million or greater

Specification No. 1383W

  • Schedule A/B: EM-25 Service Connection and Flow Control and Chlorination Facility

General Contractors must demonstrate the satisfactory completion, as a prime general engineering contractor, of at least three (3) similar projects within the last ten (10) years, of projects meeting the following requirements:

A. Contract Type: Public Works

B. Construction Type: 24-inch diameter and larger valves with electric motor actuator, 24-inch diameter and larger control valve, chemical metering facilities and related civil structural, electrical, instrumentation, controls; previous work experience with Metropolitan Water District of Southern California (MWD) is preferred.

C. Valve: $2 million or greater

General Contractors failing to meet these minimum requirements will be rejected and will not be prequalified.  In addition, each General Contractor will be evaluated utilizing the factors listed on the prequalification rating chart made a part of this package.

PLANHOLDER REGISTRATION:  If obtaining these documents online, please complete the Planholder Registration form to be placed on the official planholders list and receive notifications of addenda and/or letters of clarification issued (for this project). Bidders are responsible for ensuring that they have received any and all addenda. If you have any questions, please email dixitl@emwd.org.

PUBLIC WORKS CONTRACTOR REGISTRATION: Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration.  To obtain an extract go to: https://efiling.dir.ca.gov/PWCR/