Spec. 1378W McCall Boulevard Pipeline Replacement Project
Department | Construction |
---|---|
Category | Closed |
Publication/Issue Date | 07/07/2020 6:00 AM |
Close Date | 08/03/2020 5:00 PM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
ORIGINAL BID DOCUMENTS
1378W Appendix A - Approved Materials List
1378W Appendix B - Geotechnical Investigation
1378W Appendix C - Pothole Report
1378W Appendix D - Abandonment Plans for Existing Pipe
1378W Appendix E - CEQA Notice of Exemption
1378W Appendix F - Standard Operational Control Strategy, Sequence of Work, and Work Restrictions
SITE VISIT WALK THROUGH SIGN-IN SHEET
Pre-Bid Walk Through Sign In Sheet
ADDENDA/LETTER OF CLARIFICATION
Section 01026_Schedule of Values
PROPOSAL RESULTS
PROPOSAL PACKAGES
Norstar Plumbing and Engineering, Inc.
Ferreira Construction Co., Inc. dba Ferreira Coastal Construction Co.
Kirtley Construction, Inc. dba TK Construction
PROJECT INFO
Official Bid Publication Date posted on EMWD website: July 7, 2020
Bonding Estimate: $2 - $2.5 Million
Project Location: City of Menifee along McCall Boulevard between Valley Boulevard and Bradley Road, and along Bradley Road, 250 feet north and 200 feet south of the intersection of Bradley Road and McCall Boulevard.
PLANHOLDER REGISTRATION: If obtaining these documents online, please complete the Planholder Registration form to be placed on the official planholders list and receive notifications of addenda and/or letters of clarification issued (for this project). Bidders are responsible for ensuring that they have received any and all addenda. If you have any questions, please email pillowb@emwd.org
PUBLIC WORKS CONTRACTOR REGISTRATION: Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration. To obtain an extract go to: https://efiling.dir.ca.gov/PWCR/