Spec 1345: Solar Renewable Energy Initiative – Phase 3 Site Preparation Construction
Department | Construction |
---|---|
Category | Awarded |
Publication/Issue Date | 10/15/2018 6:00AM |
Close Date | 11/14/2018 10:00AM |
Refer to the Notice Inviting Bid or Addenda for Important Dates
ORIGINAL BID DOCUMENTS
Notice Inviting Bid & Pre Bid Walk Thru Map/Directions
Specification
Proposal Package
Construction Drawings
Appendix A - Approved Materials List
Appendix B - Trumble Road Stockpile Soil Analysis
Appendix C - Geotechnical Reports - Reference Only
Appendix D.1 - Construction Contract Drawings and CAD files
Appendix D.2 - Construction Contract Drawings and CAD files
Appendix E - Record Drawings_Existing Solar Facilities (For Reference Only)
Appendix F - Survey Base CAD Files
PRE BID WALK THRU SIGN IN SHEET
Prebid Walk Thru Sign-In Sheet
ADDENDA/LETTER OF CLARIFICATION
BID RESULTS
BID PROPOSALS
Sukut Construction, LLC
Rockforce Construction, LLC
Kiewit Infrastructure West Co.
Stronghold Engineering, Inc.
Los Angeles Engineering, Inc.
PROJECT INFO
Official Bid Publication Date posted on EMWD website: November 14, 2018 at 10:00 a.m.
Bonding Estimate: $12 MIL to $14 MIL
Project Location: MVRWRF Moreno Valley, CA, PVRWRF Perris, CA, SJVRWRF San Jacinto, CA, SCRWRF Sun City, CA
PLANHOLDER REGISTRATION: If obtaining these documents online, please complete the Planholder Registration form to be placed on the official planholders list and receive notifications of addenda and/or letters of clarification issued (for this project). Bidders are responsible for ensuring that they have received any and all addenda. If you have any questions, please email abellam@emwd.org.
PUBLIC WORKS CONTRACTOR REGISTRATION: Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration. To obtain an extract go to: https://efiling.dir.ca.gov/PWCR/