SPEC 1335W: WELLS 201, 202 & 203 DRILLING AND TESTING
Department:Construction
Category:Bid Results
RFP Number:Spec #1335W
Start Date:07/31/2018 6:00 AM
Close Date:10/09/2018 10:00 AM
Refer to the Notice Inviting Bid or Addenda for Important Dates
ORIGINAL BID DOCUMENTS
PRE BID WALK THRU SIGN IN SHEET
ADDENDA/LETTER OF CLARIFICATION
- Addendum No. 1
- Addendum No. 2
- Pipe Zone Density Chart (PVC)
- Bid Proposal
- Standard Drawings (Phase 1A Well Pipelines)
- Construction Drawings (Phase 1A Well Pipelines)
- EMWD Detailed Provisions
- Appendix C - Geotechnical Baseline Report (Phase 1A Well Pipelines)
- Addendum No. 3
- Appendix D - Utility Trench Surface Repair Pavement Overlay Limits
BID RESULTS
BID PROPOSALS
- Best Drilling and Pump, Inc.
- Layne Christensen Company
- South West Pump & Drilling, Inc.
- Zim Industries, Inc.
PROJECT INFO
- Official Bid Publication Date posted on EMWD website: July 31, 2018
- Bonding Estimate: $3.5 – 4 Million
- Project Location: San Jacinto, CA
PLANHOLDER REGISTRATION: If obtaining these documents online, please complete the Planholder Registration form to be placed on the official planholders list and receive notifications of addenda and/or letters of clarification issued (for this project). Bidders are responsible for ensuring that they have received any and all addenda. If you have any questions, please email vdixitl@emwd.org
PUBLIC WORKS CONTRACTOR REGISTRATION: Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration. To obtain an extract go to: https://efiling.dir.ca.gov/PWCR/