Spec 1322: Aquasel Brine Concentration Demonstration – Prequal
Department | Construction |
---|---|
Category | Awarded |
Publication/issue Date | 05/10/2017 6:00AM |
Close Date | 06/07/2017 5:00PM |
Refer to the Public Invitation for Prequalification or Addenda for Important Dates
PREQUALIFICATION STATUS
PREQUALIFICATION DOCUMENTS
Public Invitation for Prequalification
Prequalification Forms
ADDENDA/LETTER OF CLARIFICATION
N/A
PROJECT INFO
Official Prequalification Publication Date posted to EMWD website: May 10, 2017
Submission of Completed Prequalification Package: June 7, 2017
NOTE: Failure to submit five (5) copies and two (2) CD’s (electronic copy in smart PDF) and/or incomplete packages are grounds for immediate disqualification
Notification of Prequalification Status: June 20, 2017
Bonding Estimate: $4 Million to $6 Million
Project Location: The work to be constructed is located adjacent to the Menifee/Perris I Desalter location at 29541 Murrieta Road, Sun City, CA 92586
MINIMUM QUALIFICATIONS
General Contractors must demonstrate the satisfactory completion, as a prime general engineering contractor, of at least Three (3) similar Advanced Water or Wastewater Treatment Process (not collection system or linear) projects within the last Ten (10) years, as follows:
- Contract Type: Public Works
- Construction Type: Process mechanical for package equipment treatment system from a single vendor with equipment package value of $500,000 or more
- Dollar value: $2 million or greater
- Other: Projects where the majority scope of process equipment supply is provided by a single vendor or supplier and the plans for construction are at a level of completion of 50% or greater
In addition, prospective General Contractors must have current registrations in the Central Contractor Registration (CCR) and Bradstreet Data Universal Number System (DUNS).
PLANHOLDER REGISTRATION: If obtaining these documents online, please complete the Planholder Registration form to be placed on the official planholders list and receive notifications of addenda and/or letters of clarification issued (for this project). Bidders are responsible for ensuring that they have received any and all addenda. If you have any questions, please email francisb@emwd.org.
PUBLIC WORKS CONTRACTOR REGISTRATION: Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration. To obtain an extract go to: https://efiling.dir.ca.gov/PWCR/