Skip to main content Skip to site navigation

Prequalification for Electrical Systems & Equipment Upgrades (Various CIP Projects)

RFP Post
Department Construction
Category Closed
Publication/Issue Date 09/20/2019 1:00 PM
Close Date 10/18/2019 5:00 PM

Refer to the Prequalification Invitation or Addenda for Important Dates

PREQUALIFIED CONTRACTORS

Prequalified Contractors List

PREQUALIFICATION DOCUMENTS

Prequalification Invitation
Prequalification Form

PROJECT INFO

Official Prequalification Publication Date posted on EMWD website: September 20, 2019

Submission of Completed Prequalification Package: 5:00PM Friday, October 18, 2019

NOTE: Failure to submit five (5) copies and two (2) Flash Drives (electronic copy in smart PDF) and/or incomplete packages are grounds for immediate disqualification.

Notification of Prequalification Status: October 30, 2019

Project Location: Various locations

MINIMUM QUALIFICATION REQUIREMENTS:   
Contractors must demonstrate the satisfactory completion, as a Class A – General Engineering Contractor or a Class C-10 Electrical, of at least Five (5) similar Sewage Lift or Water Booster Pump Stations, or comparable facility, involving rehabilitations or new construction, within the last Five (5) years, as follows:                                                                            

A. Contract Type: Public Works

B. Construction Type: Electrical general or specialty; Booster Pump Station type or equivalent wet infrastructure work(s) involving electric motor installation, new and/or upgraded electrical service, gear, motor control centers, generators, variable frequency drives, instrumentation and integration of components into an operational facility.

C. Other: Experience must include work of at least two (2) projects performed on new electrical construction, and three (3) performed on existing/currently operational facilities that involve temporary power, temporary electrical gear, shutdowns and tie-ins.

D. Other: Experience must include work at two (2) sewage lift stations with a minimum flow of 1,000 gallons per minute.  The work performed in within areas classified as Class 1 Division 1 and/or Class 1 Division 2.

In addition, prospective Contractors must have current registrations in the System for Award Management (SAM) and Bradstreet Data Universal Number System (DUNS).

Contractors failing to meet these minimum requirements will be rejected and will not be prequalified.  In addition, each Contractor will be evaluated utilizing the factors listed on the prequalification rating chart made a part of this package.

The Contractor shall provide a reference for each of its similar projects.  The District will be contacting each reference to determine the Contractors ability to perform the work in a satisfactory manner.

PLANHOLDER REGISTRATION:  If obtaining these documents online, please complete the Planholder Registration form to be placed on the official planholders list and receive notifications of addenda and/or letters of clarification issued (for this project). Bidders are responsible for ensuring that they have received any and all addenda. If you have any questions, please email eichpera@emwd.org .

PUBLIC WORKS CONTRACTOR REGISTRATION: Bidders (and their subcontractors listed on the Designation of Subcontractors List) must provide an extract (pdf) with bid showing active registration.  To obtain an extract go to: https://cadir.secure.force.com/ContractorSearch