Skip to main content Skip to site navigation

Sewer Standard Drawings

Post

Sewer System Construction

Drawing No.  Description Revision No. Revision Date
SA-47 Paving Detail Around Manholes 2 06/07/96
SA-79  Connecting Dissimilar Sewer Pipes 08/04/70 
SA-87 Sewer Chimney Lateral 11/01/86 
SB-8  Locking Type Manhole Cover & Frame 03/21/85 
SB-30  Reinforced Precast Shallow Manhole 07/21/97 
SB-49  Pipe Casing (Sewer Main) 04/14/10 
SB-52  Sewer Cleanouts 02/10/97 
SB-52A  Sewer Tree Laterals & Cleanout 01/25/99
SB-53  Precast Reinforced Contrete, 48" & 60" ID Manhole 01/09/03
SB-54  Precast Reinforced Contrete, 60" & 72" ID Flat top 02/02/07 
SB-58  Terminus Manhole 09/22/06 
SB-61  Manhole Cover & Frame Standard & Watertight Manholes 01/09/03 
SB-63  Sewer Connection at Concrete Encasement 02/02/93 
SB-70  Grease Interceptor with 24" Sampling Box 1 02/13/15 
SB-73  36" ID Sampling Manhole Precast Reinforced Concrete  02/16/99 
SB-75  Sand / Oil Interceptor with 24" Sampling Box 2 04/24/15 
SB-157  Pipe Zone Bedding for Sewer Pipe  04/23/13 
SB-158  Trench Backfill for Sewer Pipe   10/15/03 
SB-159  Classification of Pipe Zone Bedding for Sewer Pipe 04/23/13 
SB-176  Sewer Lateral Connections    
SB-177  Sewer Lateral 3 06/19/15
SB-179 48" and 60" Diameter Manhole Installation for HDPE Sewer Main 08/14/08

Commands