Perris North Groundwater Program

Post

The program is a long-term solution to improve groundwater quality in the Perris North Groundwater Basin, located in the Moreno Valley area. The program will not only address groundwater contamination, but it will also continue to provide a safe and reliable water supply for surrounding communities.

EMWD received a grant from the State Water Resources Control Board to fund approximately half of the project costs for its Perris North Groundwater Program. That grant is funded by the voter approved Proposition 1 Water Bond of 2014.

 

Perris North Groundwater Program Fact Sheets

Perris North Groundwater Program - English Fact Sheet

Perris North Groundwater Program - Spanish Fact Sheet

Well Drilling Fact Sheets

Well Drilling - English Fact Sheet

Well Drilling - Spanish Fact Sheet

Overview Letters (sent to communities surrounding the entire Program alignment)

Overview Letter -- April 2021

Overview Letter -- February 2022

Overview Letter -- December 2022

Contact Information:
Alma Ramirez
Public Affairs Officer
951-928-3777, ext. 4370
ramireal@emwd.org

Well 65 and 66

Located near Ironwood Avenue and Heacock Street in Moreno Valley.

Well 65 – Ironwood Avenue Street View Rendering

Well 65 - Rendering

Well 66 – Inside look Rendering

Well 66 - Rendering

This project consists of drilling two groundwater wells along Ironwood Avenue between Heacock Street and Nita Drive.

Project Update:  Well drilling has been successfully completed at Well 65 and Well 66.  24-hour drilling was required to ensure the structural integrity of the well.  A project will be bid out at a later date to construct the structure, piping, and motors needed to operate the wells.  That activity will be limited to daytime work.

Project Timeline:  Winter 2020/2021 - TBD

Customer Communications

Well 65 and 66 Customer Letter -- December 2020

Well 65 and 66 Customer Letter #2 -- December 2020

Well 65 and 66 Customer Letter -- February 2021

Well 65 and 66 Customer Letter -- March 2021

Well 66 Customer Letter -- April 2021

Well 65 and 66 Customer Letter -- May 2021

Well 206 and 207 – Perris North Groundwater Treatment Facility

Located near Perris Boulevard and Bay Avenue in Moreno Valley.

Well 206 and 207 – Perris North Groundwater Treatment Facility Overview Rendering

Well 206 and 207 - Perris North II Groundwater Treatment Facility Rendering

This project consists of two groundwater wells and a centralized treatment facility, to clean the groundwater from four different well sites using a Granulated Activated Carbon treatment process.  This facility will also be used for the Cactus II Feeder, Phase I Project.

Project Update:  Well drilling has been successfully completed for Well 206 and Well 207.  24-hour drilling was required to ensure the structural integrity of the well.  A project will be bid out at a later date to construct the structure, piping, and motors needed to operate the wells.  That activity will be limited to daytime work.

Project Timeline:  Spring 2021 – TBD

Perris North Groundwater Treatment Facility -- English Fact Sheet

Perris North Groundwater Treatment Facility -- Spanish Fact Sheet

Customer Communications

Well 206 Project Commencement Letter -- May 2021

Well 206 Well Drilling Commencement Letter -- June 2021

Well 206 Project Update Letter -- August 2021

Well 207 Project Commencement Letter -- September 2021

Well 207 Well Drilling Commencement Letter -- September 2021

Well 208 – Santiago Drive

Located on Santiago Drive, at the City of Moreno Valley Corporate Yard.

Well 208 – Santiago Drive Overview Rendering

Well 208 - Santiago Rendering

This project consists of a groundwater well along Santiago Drive in the City of Moreno Valley’s Corporate Yard. 

Project Update:  Well drilling has successfully completed at Well 208.  24-hour drilling was required to ensure the structural integrity of the well.  A project will be bid out at a later date to construct the structure, piping, and motors needed to operate the well.  That activity will be limited to daytime work.

Project Timeline:  Summer 2021 – TBD

Customer Communications

Santiago Customer Letter -- February 2021

Project Commencement Letter -- May 2021

Well Drilling Commencement Letter -- June 2021

Project Update Letter -- August 2021

Project Update Letter -- September 2021

Well 209 – Victoriano

Located on Los Cabos Drive in the City of Moreno Valley.

Well 209 (Victoriano) – Overview Rendering

Well 209 - Rendering Overview

This project consists of a groundwater well along Los Cabos Drive in the City of Moreno Valley. 

Project Update:  Well drilling has successfully completed at Well 209.  24-hour drilling was required to ensure the structural integrity of the well.  A project will be bid out at a later date to construct the structure, piping, and motors needed to operate the well.  That activity will be limited to daytime work.

Project Timeline:  Spring 2021 – TBD

Customer Communications

Project Commencement Letter -- April 2021

Well Drilling Commencement Letter -- April 2021

Door Hangers -- Distributed to Communities Immediately Surrounding Well Site

Project Update Letter -- August 2021

Project Update Letter -- April 2022

Project Update Letter -- September 2022

Perris North Pipeline Project

Phase 1 Location:  East on Sweet Grass Drive, South on Flaming Arrow Drive, and East for a portion of Bay Avenue

Phase 2 Location:  Primarily along Kitching Street

Phase 3 Location:  Primarily along Perris Boulevard

Perris North Pipeline Alignment (Phase 1 in red)

Perris North Pipeline Alignment

This project consists of approximately 32,000 linear feet of pipeline that will connect the wells as part of the Perris North Groundwater Program to the Perris North Groundwater Treatment Facility on Perris Boulevard.  These pipelines would be located primarily within roadway right of ways.

Phase 1 Timeline:  Summer 2021 – Fall 2021

Phase 2 Timeline:  Spring/Summer 2023 - TBD

Phase 3 Timeline:  Winter 2023 - TBD

Perris North Pipeline Project -- English Fact Sheet

Perris North Pipeline Project -- Spanish Fact Sheet

Customer Communications

Phase 1 - Project Commencement Letter -- June 2021

Phase 1 - Project Commencement Flyer -- June 2021

Project Update Door Hangers (distributed to neighbors immediately surrounding construction activities) -- August 2021

Door hangers (distributed to affected customers ahead of water line shutdown) -- August 2021

English/Spanish Customer Letter (distributed to affected customers ahead of water line shutdown) -- August 2021

Door hangers (distributed to customers ahead of final paving of project alignment) -- September 2021

Phase 1 - Project Update Letter -- September 2021

Monitoring Wells

Locations are currently being finalized.

This project consists of a series of smaller diameter wells used to monitor groundwater quality and supply. 

Estimated Project Completion Date:  TBD