Notice of Determination Murrieta Road Transmission Pipeline Project
Date Posted | Tuesday, April 28, 2020 |
---|---|
Date Approved | Wednesday, March 18, 2020 |
Notice of Determination Murrieta Road Transmission Pipeline
Project Description:
Eastern Municipal Water District (District0 proposes to implement the Murrieta Road Transmission Pipeline Project (proposed Project) to construct and operate a 36- to 42-inch diameter water transmission line from Perris II Desalter Complex (Desalter) in the City of Menifee mostly in the Murrieta Road right-of-way to La Piedra Road where the proposeed pipeline will connect to an existing 36-inch diameter water main in La Piedra Road about 250 feet east of its intersection with Murrieta Road. The proposed Project will provide capacity to transmit potable water from the Desalter to the existing main in La Piedra Road.
Contact:
Joseph Broadhead
Principal Water Resources Specialist
951-928-3777, ext. 4545