Project Status: Goetz Road backbone sewer line and Subarea 4 sewer system are in design – not yet ready for construction.

Project Description:  The project will install over 3,000 feet of eight inch diameter pipeline that will help improve water pressure for the homes along Oakwood Street, Carroll Street, Day Street, and Pinewood Street, in the area south of Cajalco Road.   The project will see remote water meters relocated to the front of each property, and the new pipeline will connect to the existing water lines in the community of Mead Valley.  Relocation of the meters will increase water pressure and fire flow capacity for the community. 

Project Timeline: The project is set to begin construction in the spring of 2024 and last through summer of 2025. 

Project Purpose: Improves operational efficiency and increases water pressure and fire flow capacity for the community. 

 

Project Fact Sheet (English)

Project Fact Sheet (Spanish)

Contact Information:
Amanda Fine
Public Affairs Manager
finea@emwd.org
951.928.3777; ext. 4206

Sign up for project e-notifications