Skip to main content Skip to site navigation

Good Hope Pipeline Project
Located along Eucalyptus Ave west of Spring Street, Club Drive between Theda Street and Spring St, Main Street, Maple Avenue, Pine Street, Cherry Lane, and Maguglin Way.

Post

Project Status: Goetz Road backbone sewer line and Subarea 4 sewer system are in design – not yet ready for construction.

Project Description:  The project will install over 1,700 feet of eight inch diameter pipeline that will help improve water pressure for the homes along Eucalyptus Avenue west of Spring Street, Club Drive between Theda Street and Spring Street, Main Street, Maple Avenue, Pine Street, Cherry Lane, and Maguglin Way.  The project will see remote water meters relocated to the front of each property, relocation of the meters will increase water pressure and fire flow capacity for the community. 

Project Timeline: The project is set to begin construction in the spring of 2024 and last through summer of 2025. 

Project Purpose: Improves operational efficiency and increases water pressure and fire flow capacity for the community. 

 

Project Fact Sheet (English)

Project Fact Sheet (Spanish)

Contact Information:
Amanda Fine
Senior Public Affairs Program Manager
finea@emwd.org
951.928.3777; ext. 4206

Sign up for project e-notifications