Recycled Water Standard Drawings

Print
Press Enter to show all options, press Tab go to next option

Recycled Water System Construction

Drawing No.  Description  Revision No.  Revision Date 
PB-1 Metered Service Line - Recycled Water  5 05/15/15 
PB-4  Installation of Vertical Gate Valves, Steel Pipe 14" & Larger & PVC, DI 4 & AC Pipe 4" & Large - Recycled Water  03/12/01 
PB-5  Reclaimed Water Steel Pipeline Installation  01/27/95 
PB-6  Pipe Installation for AC, Ductile & PVC Pipe - Recycled Water  03/14/01 
PB-10  2" Recycled Meter Installation 7 06/09/15 
PB-10A  2" Recycled Service Connection  06/09/15 
PB-11  1-1/2" Recycled Meter Service Connection  10/31/08 
PB-12  1" Recycled Water Meter Installation 06/09/15 
PB-13  3" Recycled Meter Installation  1 12/13/16
PB-14  4" Recycled Meter Installation  1 12/13/16
PB-15  6" Recycled Meter Installation     
PB-16  8" Recycled Meter Installation     
PB-17  Agricultural Above Ground Metered Service - Recycled Water  4 04/24/13
PB-18  4"-8" Recycled Water Blow Off 5 12/19/13