Construction Bid Results

Print
Press Enter to show all options, press Tab go to next option

RFP NumberTitleStartingClosingStatus
Spec. 1264P-RebidSpec. 1264P-Rebid Alessandro Pond Optimization Phase 106/20/2018 6:00 AM08/09/2018 10:00 AMClosed
Spec 1329SPEC 1329 OMC LABORATORY MODIFICATION PROJECT - PREQUAL ONLY06/18/2018 6:00 AM07/17/2018 10:00 AMCanceled
1338W1338W Perris II Desalination Facility PREQUAL ONLY05/29/2018 6:00 AM06/25/2018 5:00 PMClosed
Spec 1334PSPEC 1334P REACH 4 REC WATER BOOSTER STATION UPGRADE04/30/201806/12/2018 10:00 AMClosed
Spec 1320WSPEC 1320W: DUNLAP DRIVE PIPELINE AND ROMOLAND FEEDER REPLACEMENT PROJECT04/09/2018 6:00 AM05/08/2018 10:00 AMAwarded
Spec #1331WSPEC 1331W: WELL 205 DRILLING AND TESTING03/05/2018 6:00 AM04/03/2018 10:00 AMAwarded
Spec 1264PSPEC 1264P ALESSANDRO POND OPTIMIZATION PHASE 103/05/201804/24/2018 10:00 AMCanceled
SPEC 1325SSPEC 1325S: G STREET AND CASE ROAD SEWER IMPROVEMENTS12/28/201702/08/2018 10:00 AMAwarded
Spec #1328W1328W: LAS PALMAS WATER PIPELINE INSTALL PROJECT12/20/2017 9:44 AM01/25/2018 10:00 AMAwarded
Spec 1330SSpec 1330S De Anza Lift Station Force Main Project12/07/2017 6:00 AM01/09/2018 2:00 PMAwarded
Spec 1319WSPEC 1319W: POTABLE WATER WELL NO. 3811/16/201712/21/2017 10:00 AMAwarded
Spec 1310WSpec. 1310W Post Road Hydropneumatic Booster Pump Station11/09/2017 6:00 AM12/07/2017 10:00 AMAwarded
Spec 1304SSPEC 1304S, SUN CITY LIFT STATION ELECTRICAL UPGRADES09/28/201710/31/2017 2:00 PMAwarded
Spec 1308PSpec 1308P French Valley RW Pipeline Ph 109/21/2017 6:00 AM10/19/2017 10:00 AMAwarded
Spec 1286WSPEC 1286W PUMP ELECTRIFICATION (PHASE 1)08/10/2017 6:00 AM09/28/2017 10:00 AMAwarded
Spec 1309WSPEC 1309W: PASEO VIVORA PIPELINE REPLACEMENT PROJECT07/25/201708/22/2017 10:00 AMAwarded
Spec #1322Spec 1322 AQUASEL BRINE CONCENTRATION DEMONSTRATION07/20/2017 6:00 AM09/06/2017 2:00 PMCanceled
SPEC 1306PSPEC 1306P COTTONWOOD AVENUE RECYCLED WATER PIPELINE (WEST)06/28/2017 6:00 AM07/26/2017 2:00 PMAwarded
Spec #1312SSpec# 1312S: MV/PV/SJV RWRFS Disinfection System Conversion06/06/201707/10/2017 2:00 PMAwarded
13221322 AQUASEL BRINE CONCENTRATION DEMONSTRATION - PREQUAL05/10/2017 6:00 AM06/07/2017 5:00 PMAwarded
Spec # 1294WSPEC 1294W: Daily Road Drainage and Hydro Booster Station01/31/2017 6:00 AM02/28/2017 10:00 AMAwarded
Spec. 1296SSpec. 1296S Quail Valley Subarea 9 Phase 1 Sewer01/04/2017 6:00 AM02/23/2017 10:00 AMAwarded
Spec 1274WSpec 1274W Perris and Elder Booster Station01/03/2017 6:00 AM02/07/2017 10:00 AMAwarded