Skip page navigationEMWD Logo
Eastern Municipal Water District

Site map | Contact Us

Meet EMWD Water Service Recycled Water Conservation Water Education News & Info Development Services Doing Business
 

 

New Construction: Special Requirements

Annexation – Properties that are outside the current District boundaries that desire service from EMWD must apply for annexation. Contracts Department review and EMWD Board approval must be obtained before filing with Local Agency Formation Commission can be started. Resolutions and other proceedings follow approval.

Backflow Devices – All commercial domestic and landscape water meters will require installation of an EMWD approved reduced pressure backflow prevention assembly which is to be installed by the applicant and is subject to testing and inspection by EMWD Backflow Department .

Pre-construction Meeting – Any water service connections or sewer lateral connections to existing facilities which are installed by applicant/applicant’s contractor (must meet licensing requirements) will require a pre-construction meeting prior to any work being performed with follow up site inspections. Pre-construction meetings are to be scheduled through EMWD Field Services department with proceeding inspections to be scheduled and performed by EMWD’s Inspection department.

Request for Private Water/Sewer Onsite Systems- Such requests will require special conditions of approval from EMWD. A “Hold Harmless Agreement” will also be required to be executed by the landowner in the presence of a notary public.

Top

 

 

| meet EMWD | water service | recycled water | conservationwater education | news & info |development svcs | doing business |

| home | site map | contact us |

Copyright © 2000-2007 Eastern Municipal Water District. All Rights Reserved.
Please address any comments about this web site to webmaster@emwd.org.
 
Site designed by tWrite, inc.