Fees are subject to change through Board approval. Charges are based on the fees in effect at the time payment is made.
Land Development
Charge Description |
Amount |
Lot Based |
Project Based |
Fee |
Deposit |
Fee |
Deposit |
| Annexation Processing |
|
|
$200.00/Acre |
|
| Construction Engineering-Sewer |
|
|
** |
|
| Construction Engineering-Water |
|
|
** |
|
| Fire Flow Computer Modeling |
$147.00 |
|
|
|
| Fire Hydrant Certification Letter |
$85.00 |
|
|
|
| Static Pressure Test |
$30.00 |
|
|
|
| Unauthorized Installation/Connection Penalty |
$1,000.00 |
|
|
|
| Fire Hydrant Installation: |
| Standard |
$7,050.00 |
|
$7,050.00 |
|
| Super |
$7,310.00 |
|
$7,310.00 |
|
| 4" Blow Off Installation |
$5,630.00 |
|
$5,630.00 |
|
| Fire Hydrant Upgrade |
$1,790.00 |
|
$1,790.00 |
|
| Frontage: |
| Water - 8" & under waterline |
$21.50/LF |
|
$21.50/LF |
|
| Water - 12" & over waterline |
$32.00/LF |
|
$32.00/LF |
|
| Sewer |
$22.50/LF |
|
$22.50/LF |
|
| Hot Tap |
|
$4,740.00 |
|
$4,740.00 |
| Hydrant Flow Test |
|
|
$235.00 |
|
| Interagency Sewer Connection Permit |
|
|
$945.00 |
|
| Landscape Financial Participation |
$3,363.00/EMS |
|
$3,363.00/EMS |
|
| Meter/Water Lateral Relocation (<15') |
|
|
$100.00 |
|
| Misc Sewer Connection Inspection |
|
$577.00 |
|
$577.00 |
| Misc Water Service Connection Inspection |
|
$577.00 |
|
$577.00 |
| Miscellaneous |
|
|
|
*** |
| Non-Interference Review |
|
|
$48.00 |
|
| Plan Check Engineering: |
One or two systems < 2 sheets |
|
|
|
$1,000.00 |
| One system
3-9 sheets |
|
|
|
$2,000.00 |
| One system 10+ sheets |
|
|
|
$2,500.00 |
| Two Systems 3-9 sheets |
|
|
|
$3,000.00 |
| Two Systems 10+ sheets |
|
|
|
$4,000.00 |
| Plan-Of-Service Engineering |
|
|
|
$1,000.00 |
| Quit-Claim Processing |
|
|
$720.00 |
|
| Rough Plumbing Inspection |
$180.00 |
|
$180.00 |
|
| Rough Plumbing Inspection - (Large Businesses) |
$480.00 |
|
$480.00 |
|
| Sewer Lateral Inspection: |
| Property Line |
$195.00 |
|
$195.00 |
|
| Sewer Line |
$346.00 |
|
$346.00 |
|
| Temporary Construction Meter ($840 TTL) |
|
|
$240.00 |
$600.00 |
| Temporary 4" Construction Meter |
|
|
|
$2,900.00 |
| Temporary 6" Construction Meter |
|
|
|
$3,100.00 |
| Will Serve Letters: |
| Will Serve (Type 1) |
$31.00 |
|
|
|
| Will Serve (Type 2) |
$86.00 |
|
|
|
| Will Serve (Type 3) |
$120.00 |
|
|
|
**As determined on Standard Water and/or Sewer Facilities Service Agreement |
| ***As determined by District Staff |
|